According to industry sources reported on November 25, LG Energy Solution is preparing manufacturing infrastructure for lithium manganese-rich (LMR) batteries. The company is in discussions with major component suppliers and preparing to open bidding for production equipment, though the firm has not made any public announcement regarding these efforts.
Faster Notching and Stacking
The manufacturing operation is expected to take shape at Ultium Cells, the Tennessee-based partnership between LG Energy Solution and GM located in Spring Hill. The facility would manufacture prismatic cells to GM's specifications. Industry sources indicate the plan calls for eight production lines deployed across two phases, with four lines in each phase, and commercial-scale output beginning in 2028. The ultimate investment size hinges on how well GM's electric vehicle sales perform. Toyota and Honda are mentioned as prospective buyers for the technology.
The strategy emphasizes speeding up the notching and stacking processes that are central to cell assembly. LG Energy Solution is reportedly evaluating whether it can complete the stacking cycle in less than 0.3 seconds.
Addressing LMR Weaknesses
LMR technology faces known challenges: the cells shed some lithium when first charged, and their voltage gradually declines as they age. To mitigate these issues, LG Energy Solution is said to be developing protective coatings for the cathode, exploring silicon-based anode alternatives, and fine-tuning the separator, electrolyte formulation, and chemical additives. The company has not revealed the planned capacity in gigawatt-hours or identified its suppliers.
In May 2025, GM and LG Energy Solution disclosed that their LMR prismatic cell design delivers 33% more energy density than the best lithium iron phosphate (LFP) alternatives while maintaining cost parity. Ultium Cells intends to begin commercial manufacturing of these cells in the United States by 2028.
Source: Battery-News



